works
Design technology
2026Consideration of earthquake-resistant measures for priority reservoirs designated for disaster prevention.
2026Design of disaster prevention measures for road embankment slopes
2026Regular inspections to extend the lifespan of bridges
2025Design of retaining wall structures associated with road reconstruction.
2025Inspection of the structural integrity of urban river management facilities
2025Detailed design of branch lines for the main sewage line in Kumamoto City
2025Observational survey to understand landslide behavior
2024Repair design for facilities to prevent landslides on steep slopes
2024Deterioration diagnosis of the foundation structure of the sluice gate control building.
2023Seismic performance verification of agricultural water facilities